In collaboration with Gensler and other design entities, the San Diego Padres have announced an ambitious renovation project for the iconic Western Metal Supply Co. Building at Petco Park, which is slated for completion by the 2025 Major League Baseball's Opening Day.
This effort reflects the team's commitment to maintaining and modernizing the ballpark while preserving the building's historic character.
Key updates include:
1. Expanded Team Store: The Padres New Era Team Store will grow by approximately 1,000 square feet, featuring modern finishes, enhanced lighting, optimized displays, and improved checkout areas.
2. Enhanced Entertainment Suite: Located in the left field corner, this suite will offer increased seating, luxury finishes, and an expanded deck for larger groups.
3. Upgraded Budweiser Loft: The fifth-floor loft will transform into a more social and dynamic space with a renovated bar, premium furniture, games, and a newly added grand staircase connecting it to the rooftop.
4. Rooftop Redesign: The Western Metal Rooftop will feature a 4,000-square-foot elevated deck with modern hospitality touches and a celebratory lighting wall facing the field . Construction is already underway, with the changes set to be unveiled for the 2025 season opener against the Atlanta Braves
No comments:
Post a Comment