From the Community Christian Church blog, Kansas City Mo.
Wright circa 1940 |
“What?” one member as to exclaim later, “A building on stilts? Why, it might get to rocking and lull some of the church members to sleep.” Wright dispelled any ideas of a building “on stilts,” hinting that the pillars he was suggestiong would be similar to the mushroom-shaped supports on a $1,000,000 office building in Racine, Wisconsin.
The idea of air-conditioning for the building was met with much disfavor from Wright. “Why, I’ve gotten more colds in so-called air conditioned buildings than any other place,” he exploded. He went on to explain that the building he envisioned would be comfortably cool in the summer and warm in the winter using a floor heating and cooling system, the floor being heated or cooled as the season demanded, gravity taking care of the rest. He also suggested removable pews in order to give the auditorium capabilities for varied uses.
Burris_and_FLWWright presented his finished plans to the building and finance committees in June 1940. Parking for 150 cars was allowed; construction of the building would be of steel and rose-tinted concrete. A green copper dome would sit above the chancel area. Wright claimed the building would be fireproof, earthquake, and vermin-proof” and upkeep would be virtually nil.
The building was designed in three sections which could be constructed separately. The main part – the auditorium – would cost approximately $100,000. The second part, the chapel and social service rooms, would be $50,000; the third, with the parking areas, would be $25,000. The walls were to be 2-3/4 inches thick made from two sheets of corrugated steel with air space between. Gunnite (concrete in color) was to be sprayed on the exterior surfaces. “This is a type of architecture that should be a lesson to this city,” said Wright. “It is no mere church building, but a new order dated 10 years ahead of its time. If begun immediately, the building could be ready for occupancy by October.”
The first drawing of the Frank Lloyd Wright design concept was published in The Kansas City Star on June 13,. 1940. One outstanding feature of the design was the tower of lights which would beam from openings in the roof over the chancel area. The lights, along with bells, were to be above the sounding board that formed the ceiling of the chancel. This sounding board was to be perforated to allow light to streak the cancel area. The steeple lights were still planned as late as December, 1941, projected to consist of eight 1,000 candle power lights which would “probably be used during the holiday season.” However, this feature of Wright’s design was never completed. A 1,200-seat auditorium, sloping to a platform as in a theatre, was an integral part of Wright’s concept. The 46th Street entrance would be designed without steps, an early recognition of the needs of the handicapped.
On October 30th, Wright sat in a lengthy conference with city officials, struggling to keep his patience as he listened to the Director of Public Works and the Commissioner of Buildings. The city refused to grant a permit for the building on the grounds that it was too radical to meet the provisions of the city’s building code.
“It is a question,” said the famous architect, “whether the city officials are going to abide by the letter of an outdated building code, or will permit it to be liberalized as a tool for progress. I plan to put the weight of my building on steel and concrete piers and then put an envelope around them. I don’t need ponderous walls, such as the city code engineers think are necessary. I have no basement in this church and the weight of the congregation is going to rest right on the ground through a concrete floor. The problem of stresses and weights, as worked out in my plan, is absolutely correct and guarantees the most safety. Another thing the city engineers don’t approve is my plan for heating the church through heat units built into the floor. What more logical place could there be since heat rises?”
At the end of the conference, Wright was accused of planning to put up a circus tent, a mere shell of a building. Wright’s plans were considered “skimpy” and the city officials insisted on “plans that any good engineer could understand.” Not until a redesigning of the foundation had been accomplished was the way paved for a foundation permit. This compromise utilized concrete foundations instead of the floating foundation originally planned by Wright. Once construction began, the Commissioner of Buildings made daily inspection tours at the site and forced builders to add tons of steel to insure safety.
The construction superintendent, Victor Olle Holm, was quoted as saying of Wright, “You can learn the 5-foot modules and the angles of the building fairly easy, but it takes a lot of study to understand Frank Lloyd Wright. Me, I call him more an artist than an architect. He is like the surgeon who is trying a new operation, or an old operation in a new2 way. Wright is the experimenter looking for new and better ways, and usually his experiments set a new mark for architects to shoot at. Sometimes his new ideas may have their faults, but they can be ironed out.”
Architect's rendering circa 1940 |
-->
You can learn more at www.franklloydwright.org
No comments:
Post a Comment